Home Companies Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd

FRP MBR Wastewater Plant Membrane Bioreactor Sewage Treatment Plant

Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd

Contact Us

[China] country

Trade Verify

Address: Unit 1603, unit 1, building 4, No. 28, Wenchang Road, Licang district,Qingdao(This place is only for communication)

Contact name:admin

Inquir Now

Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

FRP MBR Wastewater Plant Membrane Bioreactor Sewage Treatment Plant

Country/Region china
City & Province qingdao
Categories Water Treatment
InquireNow

Product Details

Integrated Containerized Sewage Treatment Plant Equipment Machine

 

JCH FRP integrated sewage treatment equipment:

 

FRP integrated sewage treatment equipment adopts the world's advanced biological treatment process, which integrates the removal of BOD5, COD and NH3-N. It is widely used in domestic sewage of high-end hotels, villas and residential quarters and similar Industrial organic sewage treatment replaces septic tanks with a low removal rate, and the effluent after treatment cannot meet the national comprehensive discharge standard. Field application shows that JCT type FRP series integrated sewage treatment equipment is a kind of equipment with very ideal treatment effect, strong durability and convenient management.

 

 

 

 

 

(1) It can be buried below the ground surface, the device does not occupy the surface area of the ground, it does not need to build a house, and it does not need heating and insulation;

(2) It consists of two sets of steel structure equipment, which is anti-corrosive paint. The antiseptic life can reach more than 15 years;

(3) The AO biological treatment process uses a push-flow biological contact oxidation tank, which can improve the solubility of oxygen in the air in water. The volume load of the filler is relatively low, and the microorganisms are in their own oxidation stage, so the amount of sludge produced is small, and it generally only takes about 90 days to drain the sludge.

(4) In order to reduce the impact of noise on the surrounding environment, the blower equipment adopts noise reduction measures such as vibration isolation pads and silencers;

(5) The fully automatic electrical control system and equipment damage alarm system have good reliability, so they are generally no special staff is required, only monthly or quarterly repairs and maintenance.

 

 

 

 

 

 

Hot Products

Egsb Anaerobic Reactor Anaerobic Reactor System Anaerobic Reactor Cost Biogas Gas Holder Introductio...
Anaerobic Hybrid Reactor Sludge In Anaerobic Reactor Function Biogas Gas Holder Introduction: The ...
Portable Biogas Digester Biogas Plant Drawing With Anaerobic Reactor Anaerobic Reactor Description: ...
Egsb Anaerobic Reactor Anaerobic Reactor System Anaerobic Reactor Cost Anaerobic Reactor Description...
Product Description: Anaerobic Reactor is a continuous stirred tank reactor designed for anaerobic ...
Product Description: Anaerobic Reactor is a highly efficient and cost-effective wastewater treatment ...