Home Companies Zhangjiagang Sunswell Machinery Co., Ltd.

Automatic Beer Filling Machine , Filling And Capping Machine For Glass / Plastic Bottle

Zhangjiagang Sunswell Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Dongli Road, Donglai, Zhangjiagang, Jiangsu 215600, China

Phone: 86-512-58233144

Contact name:Howie Sun

Inquir Now

Zhangjiagang Sunswell Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Automatic Beer Filling Machine , Filling And Capping Machine For Glass / Plastic Bottle

Country/Region china
City & Province jiangsu
Categories Plastic Extruders
InquireNow

Product Details

 

Products Description

The series equipment is used in producing all kinds of soda drink contained with polyester with bottle.Washing, filling,sealing can carried out on the same machine.The design of the machine is scientific and reasonable.

 

A fully connected line helps you optimise performance and make smarter decisions across the lifetime of your line. Our holistic approach supports your need for increased flexibility and efficiency, with minimal waste, quick SKU changeovers and lower environmental costs. Reductions in resource consumption and bottle weight, consistent bottle durability and high efficiency are all achieved through careful packaging design, detailed equipment planning and a flexible line setup.

Applicable productsCola,soft drinks,gsa soda,beer ,etc
Suitable containerPET bottles, glass bottles
Filling modeMechnical valve filling or electronic valve filling 
Capacity5000 bottles/hour---72000 bottles /hour

Detailed Image:

Rinser

The rotary wheel is a fully stainless steel welded structure.

 

Transfer starwheel
The material is super-corrosion stainless steel ,the wheel has block bottle protect device.

Filler

Rotary wheel fully made of stainless steel SUS 304. Isobaric filling method. Filling valves are made of SUS316L. Filling valves are reasonably structured with accurate filling.

Capper

Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock.
 
1. Material of filling valveStainless steel 316 avaliable
2. Material of rotary and platform of rinser and fillerStainless steel 304
3. Main motorABB/SEW(Germany)
4. Sliding bearingIgus(Germany)
5. Frequency inverterMitsubishi (Japan)
6. touch screen Digital (Japan)
7. PlcMitsubish(Japan)
8. Pneumatic componentsFesto(Germany)
9. SealsBusak+Shamban(USA)
10. Photocell switchBaner(USA)
11. Proximity switchTurck(Germany)

 

We can also provide turnkey/complete Carbonated Soft Drinks Lines:

Blowing / Filling / Combi / Labelling / Container Treatment & Cleaning / Conveying Systems / Packing / Palletising

1. CSD system
2. Bottle blowing system make PET plastic bottles ( Semi automatic / Fully automatic )
3. Water treatment system purify water (Sand filter,carbon filter,RO/UF ,Ozone sterilizer,UV sterilizer and etc.)
4. Air conveyor for empty bottle loading
5. Rinser-filler-capper 3 in 1 monoblock
6. Cap loader load caps
7. Code printer (Ink-jet printer/ laser-jet printer)
8. Labeling machine ( PVC sleelve labeling machine /OPP hot melt glue labeling machine/Self-adheisive labeling machine )
9. End packaging ( PE shrink wrapping machine / Carton packing machine )

 

FAQ:

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

Hot Products

automatic machine water line PET Plastic water mineral still pure water plants and labeling machine ...
Product Application : This washing filling capping machine is mainly used for Non-aerated carbon ...
1.stainless steel rinse heads, water spray style inject design, more save water consumption and more ...
3-in-1 filling monoblock, combined with rinsing, filling and capping. It is innovated and designed ...
Products Description The machine is used for 3 gallon & 5 gallon water filling, which is composed of ...
14 Heads Rotary Drinking Water Rinsing Filling Capping And Labeling Product Line General description ...