Home Companies KingPo Technology Development Limited

Plug Breaking Capacity Test Equipment 5A / 250VAC 50 / 60Hz 300W

KingPo Technology Development Limited

Contact Us

[China] country

Trade Verify

Address: RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK

Contact name:Lynette Wong

Inquir Now

KingPo Technology Development Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Plug Breaking Capacity Test Equipment 5A / 250VAC 50 / 60Hz 300W

Country/Region china
City & Province hong kong hong kong
InquireNow

Product Details

Chapter one: introduction of the instrument

1.1 Characters and main use

This machine is applied to test the breaking capacity of plug and receptacle, that is the same with the life-span of insert and withdraw testing. This apparatus can work together with a load machine to perform load test. You can form a closed-loop load power test system with our company's load machine to perform the simulated aging power test with plug and socket at the full load. This apparatus has a compact structure, beautiful appearance, reasonable layout, and the advantages of easy use and maintenance.

1.2 Design standards

UL817,IEC60884,VDE0620,GB2099

 

1.3 Technical Parameter

 

Series NoItemparameter
1Input power220VAC±10%,50/60Hz
2Fuse5A/250VAC
3Output power300W
4Current load≤30A
5Work modelTwo positions working independently
6Counter0~999999(can reset)
7Counter Precision±1
8Timer precision0.1S
9Dimension950×460×560(W×D×H)
10weightAbout 70KG

 

Chapter two: installation introduction

2.1 Mounting and dismounting noticeable points

2.1.1 Check the instrument if damaged in transit;

2.1.2 Check the instrument if invert;

2.1.3 Check if the specification on the nameplate of the instrument accord with your order;

2.1.4 Check if the packing list accord with real object.

If above abnormal happened, please don’t use this instrument, and timely to contact with agency or our company.

 

2.2 Safety rule

2.2.1 Before using this machine, please read manual in depth, learn related safety signs and operation steps, to ensure safety.

2.2.2 Check if the real power supply accord with it in nameplate and make sure the power well grounded.

2.2.3 Layperson forbidden to open the door or rear cover of the machine, to avoid electric shocking.

2.2.4 Instrument screen cannot be scraped by sharp objects.

2.2.5 User cannot modify the circuits or elements, otherwise the guarantee will be invalided, caused any consequences will not be afforded.

 

2.3 Installation requirement

2.3.1 The instrument should be located in the place without violent shaking, impacting, vibrating and non-corrosiveness air.

2.3.2 The instrument should be placed on horizontal and fixed work stations.

2.3.3 the instrument used ambient temperature should be 25±10℃, related humidity 50±30%RH

2.3.4 The instrument should be far away from heat source and corrosion source.

2.3.5 The instrument should be have well grounded power supply AC 220V/50Hz±10%.

 

Chapter three: operating instruction

3.1 Instrument picture

 

Figure 1: tester diagram

1 station 1: vertical clamp 2 station 2: vertical clamp

3 station 1: shift clamp 4 station2: shift clamp

5 front panel.

3.2 Introduction of the panel

3.2.1 Front panel

Figure 2: front panel

1 plug and socket connect wire terminal for station 1, connect wire L and N of tested plug and socket on station 1.

2 urgent stop button: test breakdown urgent stop.

3 power switch: main switch

4 touch screen: display test value.

5 plug and socket connect wire terminal for station 2, connect wire L and N of tested plug and socket on station 2.

 

3.2.2 Rear panel:

Figure 3: Rear panel

1 connector group: connect gas source, pressure regulating and filtered air.

2 insulation load, voltage load wiring terminal for station 1, external connect insulation load and voltage load of loading machine.

3 fan: heat release.

4 insulation load, voltage load wiring terminal for station 2, external connect insulation load and voltage load of loading machine.

5 input power receptacle and fuse box: provide power supply for instrument (AC 220V/50Hz), if need to change fuse tube, power off first, and pull up the power plug, fuse tube should be 5A/250VAC.

Hot Products

DIN-VDE0620-1 Plug And Socket Gauge For Measuring German Standard Plug And Socket Product informatio...
G10q , GX10q, GY10q,GZ10q Lamp cap gauge , "GO" GAUGE FOR CAPS C G10q, GX10q, GY10q , GZ10q GO" ...
ISO 8124-1 2014 Stainless Steel Protrusion Test Gauge Technical Parameter Material Stainless steel ...
IEC 62368 Edition 3, CDV Steel Disc, Aluminium Ring And Aluminium Foil For Wireless Charge The ...
Zhaga book 18 -Annex B Mechanical drawing of the Mechanical-stop-gauge 5.1.1 Mechanical-stop-gauge ...
IEC 62368 Edition 3 Figure 47 Figure 48 Figure 49 Foreign Metallic Objects with Insulation Board for ...