Home Companies Zhenjiang Great Wall Group Co.,Ltd

Alkyd / Hot Dip Galvanized Bailey Suspension Bridge High Performance Simple Structure

Zhenjiang Great Wall Group Co.,Ltd
Active Member

Contact Us

[China] country

Address: NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China

Contact name:Chen

Inquir Now

Zhenjiang Great Wall Group Co.,Ltd

Alkyd / Hot Dip Galvanized Bailey Suspension Bridge High Performance Simple Structure

Country/Region china
City & Province zhenjiang jiangsu
InquireNow

Product Details

Suspension Bridge is a kind of suspended-cable-system bridge,in which the steel decks are used as members,can be exerted the steel characteristic of high tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and te bridge components can be used repeatedly;The span length is adapted to 60-300m.

Specification:

 

NameBailey Suspension Bridge
AliasBailey suspension bridge; Assembled highway steel bridge, steel bridge, steel trestle bridge; Temporary sidewalk; Temporary sidewalk; Bailey bridge;
Model321; 200; GW D;
Commonly used truss plate models321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Design maximum single span of steel bridge300 meters
Standard lane width of steel bridgesingle lane 4 meters; double lane 7.35 meters; design according to demand.
Load ClassAutomobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. "
Design schemeAccording to the different spans and loads, choose the appropriate arrangement and suspension bridge scheme.
Main Material of Steel BridgeGB Q345B
Connection pin material30CrMnTi
Connection bolt grade8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosionhot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methodscantilever launching method; hoisting method; floating method; in-situ assembly method; pile-up construction method, etc.
Installation time30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements15-20 workers (determined according to site conditions)
Installation equipmentcrane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridgelarge span, no need to make pier, fast assembly, interchangeable, removable, long service life
CertificationISO, CCIC, BV, SGS, CNAS, etc.
Implementation criteriaJT-T/728-2008
ManufacturerZhenjiang Great Wall Heavy Industry Engineering Technology Co., Ltd.
Annual output12,000 tons

 

Hot Products

Bailey bridge was introduced from UK.and It is standard bridge equipment,adopted extensively and the ...
Because of the advantages of fast erection and light structure of the assembled steel bridge, it can ...
Because of the advantages of fast erection and light structure of the assembled steel bridge, it can ...
The 200-Type panel bridge is similar to the 321-Tycb200pe panel bridge from their appearance. The ...
The 200-Type panel bridge is similar to the 321-Tycb200pe panel bridge from their appearance. The ...
Because of the advantages of fast erection and light structure of the assembled steel bridge, it can ...