Home Companies zhangjiagang aquatrin Machinery co.,ltd

RCGF24-24-8 Juice Filling Machine Accuracy 99% Juice Packing Machine

zhangjiagang aquatrin Machinery co.,ltd
Active Member

Contact Us

[China] country

Address: Room 305H baoshui district Free duty textile raw material market, zhangjiagang city,Jiangsu province, China

Contact name:sales

Inquir Now

zhangjiagang aquatrin Machinery co.,ltd

RCGF24-24-8 Juice Filling Machine Accuracy 99% Juice Packing Machine

Country/Region china
City & Province jiangsu
Categories Plastic Extruders
InquireNow

Product Details

Small Fruit Juice Filling Machine Juice Filling and Packing Machine RCGF18-18-6
 
Process of juice beverage production line Raw water → raw water tank → booster pump → activated carbon filter → ion softener → precision filter → reverse osmosis unit → ultraviolet sterilizer → pure water tank → pure water pump → automatic filling line → high-speed shear tank → high-temperature pump → sugar → high-temperature pump → syrup filter → blending tank Tank → vacuum degassing machine → temporary storage tank → ultra-high temperature instantaneous sterilization → fully closed heat preservation tank → hot filling and blowing machine → automatic bottle machine → three-in-one machine → lamp detector → inverted bottle sterilizer → spray cooler → automatic set of standard shrinker, strong dryer → inkjet printer →PE film packing machine (packing machine)
 
Juice Filling Machine
 

 

Main parameter:
1,Model: RCGF24-24-8
2.Theoretical Capacity: 9000-10000BPH@330ml, 500ml; 5000-5500BPH@1 liter
3,Material: The material which contact directly with the liquid BPH s the SUS304L (Food grade), made in china. The transmission mechanism and the gear are equipped with firing A4 carbon steel.
4,Volume of PET bottle: 0.25L-3L
5,Diameter of bottle: 50-108mm
6,Height of bottle: 150-310mm
7,Cap diameter: plastic screw type cap diameter from 28mm to 38mm
8,Filling temperature: ≤60℃
9,Filling pressure: ≤0.15Mpa
10,Filling precision: ±2-3%
11,Pressure of washing: 0.2Mpa
12,Filling temperature: Normal temperature
13,Gas consumption: 0.6m³ /min
14,Total power: 5.03KW
15,Dimension: 2750*2200*2200mm
16,Weight: 4500kg
 

 

1) The filler is designed and manufactured with application of Italy technology, providing hardware guarantee for securing product quality and reducing loss.

2) Rotary wheel are fully made of stainless steel 304.

3) Filling valves are designed and manufactured with German technology, made of AISI316L, featuring high filling accuracy and high filling speed.

4) Bottles are raised and lowered by cam controlled lifting cylinder. Valve opening mechanism is actuated by air cylinder.Stainless steel SUS304 high precision filling nozzle.

5) No bottle no fill

6) Bottle struck no run
 
 

 
 

 

  • Usage: washing, filling and capping 3 in 1 monoblock is used for filling liquid into PET bottle. Full automatically; it can finish washing (bottle), filling and capping three jobs in the one machine.
  • Primary features
  • Compact conformation, good shape, cozy operation, excellent automatic and poor labor intensity.
  • Only exchanging “star wheel”, ”feeding screw” and “arc guide plate” while exchanging model of bottle to be need.
  • The all parts directly contacted with media are all adopted with food stage stainless steel without dead angle, so they can be cleaned easily.
  • Adopting advanced valve to control the inlet flow rate of liquids. It can keep the slight turbulence of liquids level in the solution barrel and ensure the accuracy in filling.
  • Closing feeding valve automatically while no bottle on machine avoiding the loss of aqueous feet. Filling automatically with a high speed and the control of liquids level is accurate.
  • High filling speed and mass flow rate, high precision of filling valve and control of liquids level is accurate and without loss.
  • The “capping head” is adopted magnetic-constant-torque device to ensure the high capping quality and without damages.
  • Adopting efficient cap settling system which carried perfect cap feeding and protection device.
  • It is adopted spiral descent fashion for the support plate for bottom of bottle at the outlet thumb wheel. And to adjust the input height is not necessary for exchanging model of bottle.
  • Carried the perfect protection system to overload; it can be used to protect facilities and operators efficiently.
  • Because of applying touch screen for operation, it is possible to realize man-machine conversation whereas the status of device running is clear at a glance.
  • The primary electric components such as touch screenPLCtransducer etc. are all adopted with world famous products.


 


SERVICE
1Warranty period is 12 months from the date of shipment.
2After we receipt 30% advance deposit, we will start to produce. When the machine is completed, buyers come to observe and test machine by themselves, until the machine is running OK, we will arrange the shipment after the buyer pay for the other 70% balance.
3The seller should supply the parts which is damaged non-contrived and is included in the standard configuration of this machine without any charges. The seller pay for freight in China, and the buyer should pay the freight out of China.
4The seller will send technician to seller to maintain the machine within one week after receiving the visa to your company during the warranty period of this machine.
5The seller should supply spare parts and service of maintenance to buyer out of warranty period, but the buyer should pay for the cost of parts and freight out of China and pay the roundtrip tickets between China and buyer, lodging and dinner, medical treatment, etc.
6The buyer should get all conditions (raw material, water, power, compress air and tools) for installation and commissioning well before seller’s technician arrives at buyer’s factory.
7The seller should supply buyer the documents for installation and commissioning within 5 days after contract is available, other related documents will be supplied to buyer before shipment.
8

The seller should send two or three technicians to buyer’s company make installation and commissioning of this machine. The time of installation and commissioning is 30 days from the date which seller’s technicians arrive at buyer’s factory and the seller prepare well all conditions for installation and commissioning.
The buyer should pay for the charges of visa cost, roundtrip ticket, lodging, meal and
Inland traffic to seller’s technician. And give each technician salary 100 USD one day.

9The seller supply training service for buyer without any charges before shipment, and can train buyer’s technicians continuously when seller’s technicians install and adjust the machine.

 
 
 
 
 
 
 
 












































Hot Products

Fully Automatic Water Plant Water Filling Equipment Automatic Bottling Machine Price water filling ...
Full Automatic 3000BPH Bottle Water Filling Bottling Packing Machine Production Line Product ...
CGF16-16-5 Food & Beverage Factory Applicable Industries Bottled Mineral Water Filling / Bottling / ...
Automatic 6000-8000BPH 3 In 1beverage Glass Bottle Water Filling Capping Machine Line Automatic ...
Product Description The machine is used for producing drinking water in PET bottle, such as pure ...
Fully Automatic Mineral Water Plant/Water Bottling Machine For Pure And Mineral Water We all know ...