Home Companies Guangdong MEI-AL Technology Co., Ltd.

650 Ton Automated Anodizing Line Aluminum Automatic Control System

Guangdong MEI-AL Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City

Contact name:Qi

Inquir Now

Guangdong MEI-AL Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

650 Ton Automated Anodizing Line Aluminum Automatic Control System

Country/Region china
City & Province foshan
Categories Glass Product Making Machinery Parts
InquireNow

Product Details

650T/month Anodizing Production Line

 

Design Parameter

一. Equipment Name: 

        Name: Control Horizontal Anodiding line

           Output: 650T/Month

 

二. Model :

       1. Model: Horizontal U mode.

 

       2. Operation style: Semiautomatic or Automatic

 

       3. Racking method: Manaul racking system

 

三. Design Condition

  1. Alloy : Aluminum 6061 to 6063 or others
  2. Anodizing film thinkness:10~ 12µm micron
  3. Average coverage area: 350m²/T (ton)
  4. Max aluminium profile length:6500mm
  5. Extrusion ratio : 2.5kg/m²
  6. Working hour/m: 300d/m x 20h/d = 600h/m
  7. Racking system: Two fixtures /rack
  8. Racking operation : Mamual
  9. Equipment Usage Rate: 0.9
  10. Power supply : AC 3phase 380v 50hz
  11. Control Power : AC220V 50Hz
  12. Water supply : 2kg/cm²·G
  13. Hot steam : 6kg/cm²·G
  14. Compressor air : 6kg/cm²·G

四, Process Tank

  1. Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
  2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 2 Tanks
  3. NeutralizationFree sulfuric acid180±20g/l】 1 Tank
  4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 3 Tanks
  5. Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 2 Tanks
  6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 1 Tank

五, Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2. Alkaline Etching
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3. Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min
  4. Anodizing
    (1) 2jig(rack)/tank x 3tanks = 6jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min

(6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1. Colour 1

1) Clour process: Mix Salts

2) Quantity: 2 jig(rack)/tank x 1tanks = 2jig(rack)

3) Current density: 70A

4) Process time: 2-8min

 

6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2) 
Quantity:6jig(rack)/tank x 1 tank
3) Process time 10-15min

 

六. Design Parameter and Setting

1. Anodizing treatment area:
1) Each anodizing process tank need 40min ,where total jig(rack)/year:

( 2 rack x 3 tank x 60min/h) ÷40min x600 hour =5400jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3) 
Area treatment/year : 5400jig(rack)x 50m² /jig =270000m²

 

2. Anodizing treatment weight:
Monthly output : 270000m²÷350m²/T*0.9=694T≧650T

 

3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

Power Rectifier : 15000A =3unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

Colour Rectifier : 8000A =2 unit

 

七. Process Chat

Discription for Un

1) De = Degreasing 

2) Rs = Rinsing,  HW Rs = Hot Water Rinsing 

4) AE = Alkaline Etching  

5) Ne = Neutralization

6)  An = Anodizing

7) Cl = Coloring 

8) Sl = Sealing 

9)  MU = Material Unloading 

10) Pc = Packing 

 

八, Composition and description of the automatic control system

1, This system is applicable to the semi-automatic production line of aluminum oxide anodization. According to its process specifications, the system is planned to adopt an upper computer monitoring and management system (composed of an industrial control computer IPC), a lower computer control execution system (PLC), detection components, and execution devices. There are two operation modes in terms of operation: manual and semi-automatic. When the system is running normally, it is semi-automatic. Based on the input of feeding data, the crane can identify the slot position in semi-automatic mode and execute corresponding oxidation, coloring and other processes. The temperature of the slot liquid meets the process requirements in semi-automatic control. In semi-automatic mode, the single step operation of the crane and related equipment can be controlled in the central control room. In manual mode, the operation can be carried out through on-site operation buttons.
 

2, Semi-automatic given control system
(1) The start and stop of the oxidation power supply can be controlled manually or by the PLC of the automated production line;
(2) PLC setting for oxidation working time timer or automated production line;
(3) The output current or voltage value and operation process of the power supply are set by the production line PLC and the central control system;
(4) The operating parameters and status can be transmitted to the upper PC of the production line through the communication interface;
(5) You can preset the set values according to the process and provided parameters.

 

九, Automatic transfer of material on the production line and transfer of material beams in the workshop

Automatic feeding and unloading lifting device:

Setting: Each feeding position is a single beam for feeding and unloading, and the lifting device is equipped with conveying equipment before and after the lifting device. The empty beam and the solid beam are separated and the six rows are used as a unit to ensure that the six rows of materials are processed in the same process, avoiding the need to allocate processes and occupying driving resources and efficiency.

Technical parameters:

(1) Lifting speed: 8m/min RV brake motor drive

(2) Beam translation speed: 8m/min WB brake motor drive

(3) Rated load: 300+300Kg

(4) Lifting stroke: 3500mm

Chain automatic conveying device in the loading and unloading area:

The loading and unloading areas are set up in total:

Lift section transfer

Technical parameters:

(1) Translation speed: 3.2m/min

(2) Rated load: 5000Kg

(3) Drive power: reduction motor 1.5kw

(4) Effective length of chain: 5400mm/2800mm

Chain automatic conveying device for pre-treatment and material preparation area:

Set up a set of feeding and unloading areas for conveying, and a set of pre oxidation treatment and storage materials for conveying.

Technical parameters:

(1) Translation speed: 3.2m/min

(2) Rated load: 9000Kg

(3) Drive power: reduction motor 1.5kw

(4) Effective length of chain: 5000mm/7500mm/

CNC automatic sorting and conveying device for drip drying area after hole sealing:

Technical parameters:

(1) Translation speed: 3.2m/min

(2) Rated load: 9000Kg

(3) Drive power: reduction motor 2.2kw

(4) Effective length of chain: 5000mm

Automatic sorting and conveying device before drying:

Technical parameters:

(1) Translation speed: 3.2m/min

(2) Rated load: 9000Kg

(3) Drive power: reduction motor 2.2kw

(4) Effective length of chain: 12000mm

Workshop material beam transfer vehicle

Technical parameters:

(1) Rated load capacity 1500 kg

(2) Variable frequency adjustable movement speed of 10-20m/min

(3) Drive power motor

Hot Products

700T/MONTH hight quality anodizing aluminum extrusion profile produciton line 一. Production ...
2500T/m Environmentally Friendly Manual Anodizing Production Line 一. Production Description : 1...
1500T / Month Anodizing Production Line and Voltage 380V~415v 一.Description 1Anodizing production ...
2000T/month Minimal waste generation Anodizing Production Line 一. Production Description: 1...
900Ton/Month Automatic Anodizing Line Process Operation Type 一.Product overview An anodizing ...
APL-850T Horizontal Oxidation production line 8000*width*3600 一. Product Description: 1.Anodizing ...