Home Companies Beijing Silk Road Enterprise Management Services Co.,LTD

Q195 / Q235 Straight Seam Welded Tube Mill Line ZG165 High Precision

Beijing Silk Road Enterprise Management Services Co.,LTD

Contact Us

[China] country

Trade Verify

Contact name:

Inquir Now

Beijing Silk Road Enterprise Management Services Co.,LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Q195 / Q235 Straight Seam Welded Tube Mill Line ZG165 High Precision

Country/Region china
InquireNow

Product Details

ZG series high frequency straight seam  welded tube machine technical accessory

 Machine type: ZG165  

 

Production capacity:

 

Sequence

item

numerical value

1

Tube diameter

Φ50.8mm~Φ165mm

2

Tube thickness

δ2.5mm~7.1mm,square tubeδ≤5.0mm

3

Rolling speed

15M/min~50M/min

When the thickness is 2mm, speed is about 50M/min

When the thickness is 3mm, speed is about 40M/min

When the thickness is 4mm, speed is about 30M/min

When the thickness is5mm, speed is about 20M/min

When the thickness is 6mm, speed is about  15M/min

When the thickness is 7.1mm, speed is about 10M/min

4

Length of tube

15M~50M

 
  • Size of steel strip:

Sequence

item

numerical value

remark

1

Thickness of steel strip

δ2.5~7.1mm

Material:

Q195,Q235

Brinell hardness:

≤60°

2

Width of steel strip

H160~520mm

3

Outer diameter of steel coil

Φmax=1800mm

4

Inner diameter of steel coil

Φ500mm~Φ600mm

5

Maximum weight of steel coil

≤10T

 

 Production working flow:

Raw material (steel strip coil) →decoiler→flattening→powerful leveling →shear and butt-welder→horizontal type accumulator→passively leveling→forming machine→high frequency welding →remove the burrs outside→eddy current flaw detector→spraying cooling →sizing machine→straightening→fixed length cutting →run out table→finished tube

 

 

 

 

 Each part of machine introduction

  1. Uncoiler

The function of this part is to separating the steel strip coil and become to the raw material to roll forming . The steel strip coil will be brought in to the below of the double-drill uncoiler, hydraulic cylinder support the steel strip coil to the centre of the double-drill uncoiler , double-drill uncoiler began moving to hold the steel strip coil, coil car  fall off by hydraulic cylinder and go back.

 

Structure type

Double-drill automatic decoiling

Inner diameter of steel coil

Φ500mm~Φ600mm

Outer diameter of steel coil

Φmax=1800mm

Width of steel coil

H160mm~H520mm

Wight of steel coil

≤10T

 

 

 

Flattening and powerful leveling machine

The function of this part is to separating the front head of steel strip on the uncoiler,also reversed bending the steel coil head to adjusting it’s character of inner curl. Steel strip will enter into the flattening machine by dynamic rubber roll. Flattening machine equipped with one set of pinch roll device and five roll leveling device ,there is one pairs centring device in front and behind it.

(Flattening machine)

 

 

 

Shear and butt-welder machine

The function of this part is using hydraulic knife to cutting the irregular part in the front and end of the steel strip through the motor controlled by the human. Adjusting the size of the welding seam, translation hydraulic cylinder moving it to the welding position, two welding platen pressing it than moving the welding gun to the position of welding seam. Opening the motor ,welding and connecting two steel strip by using carbon dioxide arc welding ,polishing and flattening the welding seam by human, so the machine can working continuous. Shear and butt-welder is consist of :electric control operating table ,hydraulic station,welding machine,pinch system,lathe bed system(lathe bed and washer adjusting device),centring system(steel strip end fixed and front head of steel strip translation device ),crane system ,cutting system(cutting device and cutting platen) and welding system(welding tractor and welding platen). Working flow: end of the steel strip enter into the position before cutting –fixed the end of the steel strip-cutting the end of the steel stirp-front head of steel strip enter into the position before cutting- fixed the front head of steel strip –crane moving –adjusting the washer-cutting the front head of steel strip-crane moving –left and right platen fall off-welding –each part back to original position.

 

Sequence

item

numerical value

remark

1

Thickness of steel strip

δ2.5~7.1m

Material:

Q195,Q235

Brinell hardness:

≤60°

2

Width of steel strip

H160~520mm

3

Structure of machine

  • Hydraulic cutting, welding automatic, carbon dioxide arc welding

 

 

 

Horizontal accumulator:

The function of this part is to storing a mount of steel strip to insure the machine working continuous when the steel strip on the shear and butt-welder..

 

structure

Ground structure.

Volume of storing

When the thickness is 3mm, can storing 700M.  4mm,can storing 600M.   5mm,can storing 500M,  6mm can storing 400M. 7.1mm can storing 300mm

Speed of feeding material

Maximum 120m/min

Range of steel strip width

H160mm~H520mm

Diameter of horizontal accumulator

6m

Storing structure

Change circles

Feeding motor

DC45KW

Driving motor

DC45KW

 

 

Forming machine:(adjusting by worm and worm shaft)

 

The function of this part is to make the steel strip become to the tube blank by forming rollers

 

 

 

parameter

remark

Portal frame

(1),group amount

Seven group

 

(2),frame material

Steel casting

 

(3),diameter of horizontal roll shaft

Φ120mm

 

(4),material of horizontal

roll shaft

40Cr

 

Vertical roll seat

(1),group amount

Nine group

Vertical roll group

(2),vertical roll

seat material

Steel casting

 

(3),diameter

Φ70mm

 

(4),vertical roll material

45#forging

 

Gear box

(1),group amount

Seven group

 

(2),box material

Steel casting

 

(3),structure

Spiral bevel gear transmission

 

(4),spiral bevel

gear material

20CrMnTi

 

(5),gear shaft material

40Cr

 

Power transmission

structure

Universal shaft transmit to horizontal shaft

 

 

Guiding ,extruding, scraping:

 

(material of extruding roll: H13  heat-resisting, no magnetic)

(scraping : exchange the scraper knife quickly ,different tube diameter choose different tool bit)

The function of this part is to centring the welding seam and guiding the tube blank to extruding device, so the welding seam will be closed before welding .  Use planer tool to remove the crater to insure the welding surface is smooth.

 

 

parameter

remark

Guiding structure

Horizontal roll type

 

Welding structure

Four roll extruding type

 

Planer tool seat adjusting structure

Lead screw adjusting, quick change knife

 

 

 

sizing machine:(adjusting by worm and worm shaft)

The function of this part is used to finishing the tube blank from the forming machine, so the tube size can meet the physical dimension customer required.

 

 

parameter

remark

Portal frame

(1),group amount

Five group

 

(2),portal frame material

Steel casting

 

(3),diameter of

Horizontal roll shaft

Φ120mm

 

(4),material of horizontal roll shaft

40Cr

Tempering and quenching treatment

Vertical roll seat

(1),group amount

Five group

 

(2),vertical seat material

Steel forging

 

(3),diameter of vertical roll shaft

Φ70mm

 

(4),material of vertical

roll shaft

45#steel casting

 

Gear box

(1),group amount

Five group

 

(2),material of box

Steel casting

 

(3),structure

Spiral bevel gear transmission

 

(4),spiral bevel

gear material

20CrMnTi

 

(5),gear shaft material

40Cr

 

Power transmission structure

Universal shaft transmission to the shaft

 

 

 

Water cooling system:adopt water tank spraying type to make sure the tube blank is cooling enough . length of water tank is 6

 

 

Roughly straightening device:(two sets)

 

The function of this part is to straightening the finished tube to achieve the ideal glancing flatness. (single side ,four roll, two sets)

 

 

parameter

remark

(1),straightening roll seat structure

Turkey’s head,360°rotating

Two sets

(2),diameter of straightening roll shaft

Φ50mm

 

(3),material of straightening roll shaft

40Cr

 

 

 

Main driven system

 

 

 

parameter

remark

Power of main motor

200KW×2 set

 

Reducer type

ZY355-9×2set

 

 

11. Computer cutting saw:

 

The function of this part is to cutting the length of finished tube as customer wanted, have the function of accumulative total for length and amount. Transmission by gear rack ,guide rail choose Thomson profile rail type.

 

High speed cutting saw

structure

Normal computer controlled cutting

(1),maximum diameter

Φ165mm

(2),maximum weight

δ7.1mm

(3),cutting length

and precision

L=5~12m,≤±6㎜

(4),driving type

Hydraulic

(5),driving motor

DC 45KW

(6),cutting motor

AC 90KW

(7),speed of cutting

Maximum 50M/min

 

 

 

12.Run out table:(double side)

 

The function of this part is convey the finished tube, equipped with dynamic roll. Double side kick out the tube, can take the waste tube to another way. Length:20M

double side type

 

 

 

 

Picture 20 run out table

 

13.High frequency welding machine:

The high frequency matched with our machine is solid-state  600  KW.

              

      Overall control table            DC speed adjustor         

Rectifier cabinet              inverter output cabinet

Air-Water cooling system          Adjusting frame

 

16.Customers responsible item.

Power of supply standard

380V/220V;50HZ;three phase four wire system

 

Power of machine

(1),high-frequency welding machine

  600  KW

 

(2),main machine

  200×2  KW

 

(3),auxiliary machine

  185  KW

 

Total:

about 1185  KW

 

Machine area covering

length110M×width10M

 

Volume of high-frequency house

length8M×width4M×height2.8M

 

Water supply

One cooling pool  50M³ /one set of high pressure pump

 

 Air supply

Air compressor   one set

 

Needed lifting machine

Air crane 10~15 Ton    two sets

 

Normal consumable auxiliary material

(1)high-frequency cable, machine cable and wire

 

(2)impedor (magnetic bar)

 

(3)saw blade

 

 

I.We will offer the include foundation drawing ,water ,electric,air layout drawing after we sign the contract. Operating manual will come along with the machine , the size and model of the purchased part and easily damaged part drawing also include.

II.My company will send 4-5 engineer to installing the machine and responsible for training the worker of customer until they can operating the machine skillful.

Note:

1. the buyer should charge our engineer of visa, roundtrip ticket, food and accommodation and USD60/person/day for salary.     

2. Terms of payment: 30% should be paid when signing sales     contract, and the remaining 70% before delivery

3. Delivery time:210 days after we receive the down payment

4. Installing time: we need about 45 days to installing and debugging the machine (all preparation work must be ok. Such as foundation ,water tank, electric wire).

5. Training time: it depend on the worker’s ability, about 30-60days.

6. Guarantee of machine: one year.

In normal circumstance , customer operating the machine correctly according to our advice, if something is broken, we will send a new one to customer by post after we received the information from customer for free.

Hot Products

99.6% Air Separation Plant KDON-3000M3/H Industrial Oxygen Plant With Low Energy Consumption ...
3000Nm3/h Series Liquid Air Separation Plant KDONAr-3000Y/4750Y/100Y, LOX, LIN, LAr, Industry Liquid ...
Argon plant Nm3/h KDONAr-3000/240Y/3000/35Y 99.999% Ar High Purity Typical Product: KDONAr-3000/240Y...
Quick Details Condition: New Place of Origin: Zhejiang, China (Mainland) Brand Name: Hangzhou ...
Cryogenic Air Separation Plant KDON-10000 Nm3/h Air Separation Unit Cutting Gas Inert Quick Details ...
Oxygen Compressor Series 2Z16-166.67 /10.8-50 2Z23/165-Ⅰ ZW0.3/8-150 ZW-36.75/30 2LY9.2/30-Ⅱ 3Z3.51...