Home Companies Foshan ABD Equipment Co., Ltd.

SUS Substrate PP Spray Booth Colour Coating Line Of Treatment For Aluminium Profiles

Foshan ABD Equipment Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: F5-2 ,North Fanhu District ,Leping Central Sanshui Foshan City ,Guangdong Province ,China

Contact name:Cindy

Inquir Now

Foshan ABD Equipment Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

SUS Substrate PP Spray Booth Colour Coating Line Of Treatment For Aluminium Profiles

Country/Region china
City & Province foshan guangdong
Categories Plastic Processing Machinery Parts
InquireNow

Product Details

SUS 304 Metal Vertical Colour Coating Line Of Treatment For Aluminium Profiles

380V 50Hz PLC LPG Heating System Colour Coating Line For Alluminium Alloy Profile

 380V 60Hz PP Spray Booth Colour Coating Line For CE Certification Equipmenet

Project specifications

Colour Coating Line With V Shaped Powder Coating Booth For Aluminium Profiles

This proposal is designed for aluminum profiles vertical powder coating line—One Booth

 

1,Design data

        A, Coating Material : Aluminum Profile

        B, Technical Description:Loading ,pre-treatment ,drying , powder coating, Curing ,unloading .

        C, coating profile specifications:

               a. Max size of the profile : 100mm×200mm×L7000mm

               b. Max Weight of the profile: 30KG

               c. Standard weight : 3.5kg

               d. Standard surface area of the profile : 400m2/T

               e. Conveyor speed 1200mm/min (500mm/min ----- 20000mm/min adjustable )

 

2, Energy supply

       A,Power supply

             Single-phase voltage:220V+10%

             Three-phase voltage:380V+10%

             Frequency:50Hz

             Equipment group line and zero line

       B,Natural gas

 

3,compressed air

       A,pressure : 7.0bar

       B,Max steam flux: 1.3g/nm3

       C,Max oil content: 0.01ppm

       D,Max Flux of the compressed air: 8m3/min

 

4,Industrial water required

       A,Pressure : 3+0.2bar

       B,Flux; 5m3/h

 

5,Pure water

       A,Conductivity : 10us/cm

       B,Flux; 4m3/h

 

6,Powder

       A,Powder characteristic : LEL≥40g/Nm3

 

7,Space between material hanging : 66mm,100mm,133mm,150mm,200mm

 

8,Production Capacity 

        Conveying chain speed: 1.2m/minute

        Total coating pcs per hour: 1200mm/minute÷150mm/pcs×60minutes=480pcs/hr

        Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr

        Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day

        Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month

 

9,Energy consumption reference for powder coating

     Max Energy Consumption of Common Powder Coating

 

No.
Equipment Names
Electric
Natural Gas
Water
Pure wate
1

Conveyor system

4KW   
2

Pre-treatment

75KW 

5m3/H

4m3/H

3

Drying oven

15KW

31m3/H

  
4

Powder coating system

60KW

   
5

Curing Over

35KW

65m3/H

  
 

Total

189KW

96m3/H

5m3/H

4m3/H

 

 

About Us

 

Foshan Anbang De Mechanical Equipment Co., Ltd. (formerly Dali Hongwei Aluminum Industry Co., Ltd. in Nanhai District, Foshan City) was established in 1996 and changed to Foshan Anbang De Mechanical Equipment Co., Ltd. in 2012. The company is located in Fanhu Economic Development Zone, Leping Town, Sanshui District, Foshan City. It covers an area of 50 acres and has a building area of 25000 square meters, with approximately 230 people. Its main products include a fully automatic vertical electrostatic powder spraying production line for aluminum profiles, a fully automatic vertical oxidation coloring electrophoresis production line for aluminum profiles, and a fully automatic vertical fluorocarbon spraying production line for aluminum profiles.

 

 

FAQ

Q1: Are you trading company or manufacturer ?
A1: We are factory and can do the exporting work by ourselves.

Q2: How long is your delivery time?
A2: About 50 workdays after received the deposit.

Q3: What is your terms of payment ?
A3: T/T and Irrevcoable L/C. 30% T/T in advance, 70% balance before shippment.

Q4: Can engineers service overseas?
A4: Yes, totally no problem.

Q5: What about the guarantee period?
A5:You will have 12 months guarantee time for the powder coating booth, if the parts broken as our mistake, we will send you by DHL.


But as we do the pre install before the laoding, so this situation won't very easy to happen we believe.


After one year, if you still have any help about the equipment, please feel free to contact us at any time, as we will supply you lifelong service.

 

 

 

 

 

 

Hot Products

Powder Coat Line With Automatic Gun System Vertical Powder Coating Line Customized Design Auto-Matic ...
Advanced Full-Automatic Vertical Powder Coating Line Of Surface Treatment Equipment Powder Feed ...
380V / 220V Vertical Powder Coating Line 8000KG For Baking Water Description of Vertical Powder ...
Vertical Anodizing Pruduction line of Aluminium Profiles Surface Pretreatment Customized Voltage And ...
PLC LPG Heating 480V 60Hz Vertical Powder Coating Line With Surface Treatment Equipment 380V 50Hz ...
Vertical Anodizing Pruduction line of Aluminium Profiles Surface Pretreatment Gas Heating Power ...